Exterior Shipping Container Metal Siding Material Design Photos and Ideas

In the midst of the pandemic, a family leverages industry connections and modular construction to quickly rebuild a cliffside getaway on a fire-ravaged site in the Kogelberg Biosphere Reserve.
The outdoor terrace folds up, and the roof can be detached so that the container home can be easily relocated.
Located at The Proxy in Hayes Valley, San Francisco, AETHERsf is a concept space constructed from three 40-foot shipping containers stacked on top of each other. In addition to a curated selection of design-focused outerwear, the space features a custom, glass-encased cantilevered lounge with reclaimed oak floors and a belt-driven "dry cleaner-style" conveyor system.
This eco-friendly escape is powered by solar panels and a wind turbine—and it even includes a full bath.
Amagansett Modular House by MB Architecture
A glassed-in walkway connects the open-plan living areas to a separate bedroom wing.
The architecture follows the natural contours of the wedge-shaped site: the building is placed on higher ground on the site’s wider east end, while exterior decking steps down to the pool to the west.
The units were designed to accommodate green roofs, which were part of the initial design intent, but put on hold for budgetary reasons.
"Each project is unique and requires a customized design, communication, and implementation strategy with an integrated design process and approach by a team tailor, the necessary specialists are recruited internally or externally," says sculp(it) of Antwerp, Belgium.
Designed for an artist and entrepreneur client, this guest house features lots of light, access to the outdoors, and an industrial vibe.
A narrow and long 8 by 40 feet empty steel shipping container in an artists’ community in San Antonio, Texas serves a playhouse, garden retreat, and guesthouse for visiting creatives.
Insta-House by MB Architects
Project Name: Box Office
Based in Sacramento, CA, TAYNR specializes in prefab homes built from shipping containers.
The main room opens to the quad through a large pivoting garage door.
Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.